This gate reconciles the exact v0.12.64 operational-continuity authorization and bounded execution before operational assurance can ever be accepted. Staging can validate only the dry-run operational-continuity execution and an independent HOLD decision. It cannot claim production operational-continuity-outcome verification, operational-assurance acceptance, accepted live requests, or provider network activity.
Reconcile dry-run operational continuity without accepting operational assurance
READYSafe QA must remain 100%, dry-run operational continuity, provider-operations owner, HOLD, operational assurance accepted NO, live requests 0, network NO.
EVIDENCE ATTACK PATHS
Operational-continuity-outcome claims that must fail closed
DECISION ATTACK PATHS
Operational-continuity acceptance decisions that must fail closed
PRODUCTION BOUNDARY
Production actions staging must never prove
READYEvery attack/production action should return 🛑 EXPECTED BLOCK.
STATE
QA policy / immutable events
Load state after starting a QA admin.
QA RUNS
Recent validation evidence
PRODUCTION LATER
Operational-stability outcome production gates — do not fake these green
Leave these open until a real production operational-continuity execution has been intentionally completed, independently reconciled, and separately accepted for operational assurance. This staging page cannot accept production operational assurance.