Provider Operational Continuity Authorization + Bounded Continuity-Control Execution Foundation
This gate separates the exact operational-resilience outcome / operational-continuity decision from the authorization that could establish bounded continuity control. Staging can rehearse only a HOLD-bound, dual-control, short-lived authorization and dry-run operational-continuity execution. It cannot claim production continuation, production operational continuity, live requests, or provider network activity.
SCHEMA
Operational continuity schema
READYExpect schema 65 after migration 0065.
SEGMENTED SELF-TEST
Cloudflare-safe operational-continuity matrix
READYEach case runs in its own Worker invocation.
SAFE QA FLOW
Rehearse operational-continuity authorization without activating production operational continuity
READYSafe QA must remain source HOLD / operational continuity accepted NO, qa-rehearsal authorization, dry-run operational-continuity execution, live requests 0, network NO.
AUTHORIZATION ATTACK PATHS
Operational-resilience-outcome authorizations that must fail closed
RESILIENCE-CONTROL EXECUTION ATTACK PATHS
Operational-resilience execution attempts that must fail closed
PRODUCTION BOUNDARY
Production actions must remain blocked from staging
READYEvery attack should show EXPECTED BLOCK.
STATE
QA policy / immutable events
Load state after starting a QA admin.
QA RUNS
Recent validation evidence
PRODUCTION LATER
Operational-resilience production gates — do not fake these green
Leave these open until a real production operational-resilience-outcome operational-continuity decision has been independently approved and an intentional production control execution has been executed. Staging cannot satisfy them.