ClaraWideoperations control QA
v0.12.56 · SCHEMA 55

Provider Operations Acceptance Authorization + Bounded Steady-State Control Activation Foundation

This gate separates an operations-acceptance decision from the authorization that could transition provider control into managed steady state. Staging can rehearse only a HOLD-bound, dual-control, short-lived authorization and dry-run control activation. It cannot claim production acceptance, active production control, live requests, or provider network activity.

SCHEMA

Operations-control schema

READYExpect schema 55 after migration 0055.
SEGMENTED SELF-TEST

Cloudflare-safe operations-control matrix

READYEach case runs in its own Worker invocation.
SAFE QA FLOW

Rehearse control authorization without accepting production operations

READYSafe QA must remain source HOLD / accepted NO, qa-rehearsal authorization, dry-run control activation, live requests 0, network NO.
AUTHORIZATION ATTACK PATHS

Operations-control authorizations that must fail closed

CONTROL-ACTIVATION ATTACK PATHS

Control activation attempts that must fail closed

PRODUCTION BOUNDARY

Production actions must remain blocked from staging

READYEvery attack should show EXPECTED BLOCK.
STATE

QA policy / immutable events

Load state after starting a QA admin.
QA RUNS

Recent validation evidence

PRODUCTION LATER

Operations-control production gates — do not fake these green

Leave these open until a real production operations-acceptance decision has been independently approved and an intentional production control activation has been executed. Staging cannot satisfy them.