ClaraWideoperational minimization QA
v0.13.38 · SCHEMA 137

Provider Operational Minimization Authorization + Bounded Minimization-Control Execution Foundation

This gate separates the exact operational-necessity outcome / operational-minimization decision from the authorization that could establish bounded minimization control. Staging can rehearse only a HOLD-bound, dual-control, short-lived authorization and dry-run operational-minimization execution. It cannot claim production operational-minimization authorization/execution, live requests, or provider network activity.

SCHEMA

Operational minimization schema

READYExpect schema 137 after migration 0137.
SEGMENTED SELF-TEST

Cloudflare-safe operational-minimization matrix

READYEach case runs in its own Worker invocation.
SAFE QA FLOW

Rehearse operational-minimization authorization without activating production operational minimization

READYSafe QA must remain source HOLD / operational minimization accepted NO, qa-rehearsal authorization, dry-run operational-minimization execution, live requests 0, network NO.
AUTHORIZATION ATTACK PATHS

Operational-necessity-outcome authorizations that must fail closed

MINIMIZATION-CONTROL EXECUTION ATTACK PATHS

Operational-minimization execution attempts that must fail closed

PRODUCTION BOUNDARY

Production actions must remain blocked from staging

READYEvery attack should show EXPECTED BLOCK.
STATE

QA policy / immutable events

Load state after starting a QA admin.
QA RUNS

Recent validation evidence

PRODUCTION LATER

Operational-minimization production gates — do not fake these green

Leave these open until a real production operational-necessity-outcome decision accepting operational minimization has been independently approved and an intentional production operational-minimization execution has been completed. Staging cannot satisfy them.