ClaraWideoperational materiality QA
v0.13.28 · SCHEMA 121

Provider Operational Materiality Authorization + Bounded Materiality-Control Execution Foundation

This gate separates the exact operational-admissibility outcome / operational-materiality decision from the authorization that could establish bounded materiality control. Staging can rehearse only a HOLD-bound, dual-control, short-lived authorization and dry-run operational-materiality execution. It cannot claim production operational-materiality authorization/execution, live requests, or provider network activity.

SCHEMA

Operational materiality schema

READYExpect schema 127 after migration 0127.
SEGMENTED SELF-TEST

Cloudflare-safe operational-materiality matrix

READYEach case runs in its own Worker invocation.
SAFE QA FLOW

Rehearse operational-materiality authorization without activating production operational materiality

READYSafe QA must remain source HOLD / operational materiality accepted NO, qa-rehearsal authorization, dry-run operational-materiality execution, live requests 0, network NO.
AUTHORIZATION ATTACK PATHS

Operational-admissibility-outcome authorizations that must fail closed

MATERIALITY-CONTROL EXECUTION ATTACK PATHS

Operational-materiality execution attempts that must fail closed

PRODUCTION BOUNDARY

Production actions must remain blocked from staging

READYEvery attack should show EXPECTED BLOCK.
STATE

QA policy / immutable events

Load state after starting a QA admin.
QA RUNS

Recent validation evidence

PRODUCTION LATER

Operational-materiality production gates — do not fake these green

Leave these open until a real production operational-admissibility-outcome decision accepting operational materiality has been independently approved and an intentional production operational-materiality execution has been completed. Staging cannot satisfy them.